NNetify

Synthetic customer opportunity example

What must a reseller establish before proposing managed SD-WAN or SASE to a manufacturer?

A synthetic manufacturing opportunity showing why operational technology, site resilience and responsibility boundaries must be established before design.

This example contains no applicant or customer data. It is discovery guidance, not an availability check, formal design, quotation, compliance decision or order.

Scenario

UK manufacturer with four plants, a warehouse and Azure workloads

  • Production systems and operational technology use the site networks.
  • Azure and Microsoft 365 traffic must be considered alongside plant dependencies.
  • The customer wants central policy, resilient access and managed security.

Initial opportunity result

3 potential BT product families to explore

Validate site resilience, operational technology boundaries, segmentation and production-critical dependencies.

BTnet leased line

A possible dedicated-connectivity route where bandwidth, service levels or resilient access matter.

Validate: Confirm each address, bandwidth, bearer, diversity, construction and service-level requirements.

BT Managed SD-WAN

A possible managed WAN route for a distributed estate requiring central policy and operations.

Validate: Confirm sites, underlay, platform preference, application flows, resilience, management scope and migration plan.

BT managed SASE and security

A possible managed security route where network and cloud-delivered controls must be considered together.

Validate: Confirm required security controls, users, sites, data locations, logging, compliance and responsibility boundaries.

Next: Use the discovery questions to qualify the opportunity, then ask Netify to validate product availability, solution design and commercial terms.

Material risks

  • Operational-technology traffic must not be treated as ordinary office traffic.
  • Physical diversity and failover need validation at each production-critical site.
  • Security monitoring and incident responsibilities must be agreed across the customer, Netify and BT.

Discovery questions

  • Which locations, access services, bandwidths, contract dates and resilience arrangements exist today?
  • Which security controls, devices, users, compliance obligations and operational responsibilities are required?

Evidence to collect

  • site criticality and recovery objectives
  • OT and IT segmentation map
  • existing circuits and physical routes
  • application dependency map
  • security-control and logging requirements
  • migration and maintenance windows

Assess an anonymous customer opportunity

Use the same controlled rules with a sector, estate type and stated needs. Do not enter names, contacts, addresses, account numbers or confidential information.

Run the assessment

Methodology reviewed 2026-08-27. Rules version 2026-08-27.1. Product fit and final design require human validation by Netify and, where applicable, BT.