Example requirements
12 UK manufacturing sites and 6 European plants with Azure, Microsoft 365, SAP, operational technology segmentation, existing MPLS, diverse circuits, resilience requirements and a fully managed SD-WAN and SASE service with 24/7 support.
BT suitability
Insufficient detail for a reliable fit decision
There is not enough project detail to distinguish genuine BT fit from a generic managed-network match. Add sites, applications, resilience, security and management scope.
The verdict uses 7 detected requirement signals and 10 linked evidence records; it never infers pricing or an undisclosed BT design.
Capabilities matched
- Application-aware managed WAN across a multi-site estate
- A single managed-service and support layer is directionally aligned
- BT documents managed SASE and security routes, including a Fortinet-powered SASE service
- Cloud and SaaS connectivity is relevant to BT’s documented network and multi-cloud proposition
- BT’s documented global delivery model is relevant to the stated footprint
What remains unresolved
- Site count and site types are not stated
Architecture considerations
- Model a phased MPLS coexistence and migration rather than assuming a single cutover.
- Map direct cloud/SaaS paths, private connectivity and internet egress per application.
- Translate resilience language into circuit diversity, failover times and application-level acceptance tests.
Security and SASE
- Separate SD-WAN functions from SASE/SSE controls and state which are mandatory.
- Confirm whether regulated data, audit or residency obligations apply.
Questions BT must answer
- Which BT platform and managed-service components are proposed, and why?
- Which underlay, diversity and failover design applies to each site class?
- Which SASE controls, logs, evidence and data-residency commitments are contractual?
- What is customer-managed, co-managed, BT-managed or excluded?
- What are the implementation sequence, acceptance tests, SLA measures and service credits?
Evidence used
- 1.1: BT's SD-WAN proposition - naming/branding (e.g. BT SD-WAN, Dynamic Network Services, Cloud of Clouds positioning)
Buyer action: Use this confirmed finding as a baseline, then require BT to state how it applies to the proposed design for your estate.
- 1.2: BT's SASE proposition - naming/branding, how BT positions SASE vs SD-WAN vs 'Secure Connect' type offerings
Buyer action: Ask BT to itemise the included licences, security functions and managed-service components.
- 1.9: Full current list of underlying technology partners named on BT's live SD-WAN/SASE page
Buyer action: Require BT to name the proposed technology platform and explain why it fits the estate.
- 2.13: Confirmed unified service desk / support model (updates 2.5)
Buyer action: Confirm the service desk, escalation route and ownership boundary across underlay, overlay and security.
- 3.2: Application performance/QoS management as BT presents it
Buyer action: Document the access type, bandwidth, backup circuit and physical diversity required for each site class.
- 2.14: Detailed, current SASE-specific NOC/SOC commitment (updates/resolves 2.7 gap)
Buyer action: Ask BT to make logging location, data residency and retention commitments explicit in the proposed service.
- 4.2: Network + security convergence under one contract
Buyer action: Define monitoring, incident response, policy management and evidence responsibilities between BT and the customer.
- 2.3: Network integration - how BT SD-WAN/SASE connects into BT's own MPLS, internet, mobile (EE), and cloud connect services
Buyer action: Document the access type, bandwidth, backup circuit and physical diversity required for each site class.
- 2.6: Global reach / multi-country delivery capability (PoPs, local loop access, in-country compliance)
Buyer action: Use this confirmed finding as a baseline, then require BT to state how it applies to the proposed design for your estate.
- 4.4: Global delivery consistency for multinational UK-headquartered firms
Buyer action: Use this confirmed finding as a baseline, then require BT to state how it applies to the proposed design for your estate.
This is an anonymised example, not a customer case study or quotation. It uses Netify's deterministic assessment rules and the evidence dataset verified 2026-08-30.